Export & Logistics
Tongjiang exports to Southeast Asia, the Middle East, North America and Australia. Some terms are fixed, some are negotiable, and this page says which is which so you know before you ask.
Certificates are on the Certifications page. Non-standard specifications are on OEM & Custom Orders.
Export Terms at a Glance
|
Minimum order quantity |
1,000 meters standard; smaller quantities negotiable |
|
Lead time |
Set at order confirmation, based on current production schedule |
|
Payment terms |
30% deposit (T/T) plus balance before shipment; 70/30 split required in some countries |
|
Standard Incoterm |
CIF, Cost, Insurance, and Freight to destination port |
|
Currency |
USD and EUR |
|
Priority export regions |
Southeast Asia, Middle East, North America, Australia |
Quantities and lead time
Minimum order is 1,000 metres. Smaller runs can be discussed, and the answer depends on the construction and diameter, so it is worth asking rather than assuming.
Lead time is set when the order is confirmed, against the production schedule at that moment, not published as a fixed number of days. Catalog constructions usually move faster because stock exists. If you have a firm site deadline, say so early and it will be built into the answer.
Payment Terms
Standard terms are a 30% deposit by telegraphic transfer with the balance before shipment. Some destination countries require 70% up front instead, balance before shipment.
Prices are quoted in USD or EUR.
Shipping
CIF to your destination port is standard, which means Tongjiang arranges and pays freight and insurance to that point. Other Incoterms can be agreed, including arrangements where you use your own forwarder.
Reels run to each machine's maximum, commonly 2,000 or 3,000 metres. Custom cut lengths are made to your contracted specification.
Mining and oil-drilling constructions are a different proposition. They run up to 127 mm and can weigh more than 60 kg per metre, which means heavier reels and freight priced accordingly. Confirm reel specification and shipping weight with the sales team when you request the quote rather than after.
Documentation
Commercial invoice, packing list and bill of lading come with every shipment.
If you need a certificate of origin or anything else customs-specific, ask when you confirm the order. Requesting it after production is finished slows everything down. Mill certificates and the CCS works approval are covered on the Certifications and Factory & Quality pages.
Meeting in person
Tongjiang exhibits at Bauma China in Shanghai and CICEE in Changsha. If you would rather look someone in the eye before placing a first order, plan around one of those.